Summer is here – so is the Ashes Cricket Series!
The Boxing Day Test this year will see Melbourne host the Australia vs. England match. Traffic disruptions will take place between 26-30 December on roads surrounding the Melbourne Cricket Ground (MCG).
In particular, Wellington Parade will be closed at the end of the day’s play to allow attendees to safely exit the precinct.
Hours of play:
This will be a match played over five days, from 26-30 December 2017.
- Session 1: 10.30am-12.30pm
- Lunch: 12.30pm-1.00pm
- Session 2: 1.00pm-3.00pm
- Tea: 3.00pm-3.30pm
- Session 3: 3.30pm-5.30pm
*Note: Hours of play may change if time is lost due to bad weather, or if minimum numbers of overs have not been bowled.
Road closures
The following roads will be closed between 26-30 December 2017:
- Brunton Avenue: 7:30am – 7:00pm
- Jolimont Street and Jolimont Terrace: 8:00am – 7:00pm
- Wellington Parade: 5:30pm – 6:00pm*
*End time may vary depending on the state of the match.
Posted by Senyo Dake
Category:
Get a ride when you need one
Start earning in your city
Get a ride when you need one
Start earning in your city
Related articles
Drive
Uber and bp pulse partner to help drivers and delivery people go electric
28May,2024 / Australia
Most popular
Transit30December,2024 / Global
Moving STRIPES: innovating student transportation at Mizzou
Transit21October,2024 / Global
Horacio’s story: gaining mobility independence through innovative transportation solutions
Transit2 January / Global
Case study: how the University of Kentucky transformed Wildcab with Uber
Engineering, Backend24October,2024 / Global
Streamlining Financial Precision: Uber’s Advanced Settlement Accounting System
Select your preferred language
Products
Company